MTA Board Greenlights $2.6B Third Track Project
The design build contract, estimated at $2.6 billion, has been awarded to a group that includes Dragados USA, Picone Construction, China Civil Construction and Halmar International. The design engineer on the project will be Stantec and Woodbury-based Cameron Engineering will be a sub-consultant.